In Material Requirements Planning (MRP), net requirements refer to the actual quantity of materials needed for production after considering existing inventory and scheduled receipts. Essentially, net requirements are the difference between the total required quantity of an item and the available supply, ensuring that enough materials are available for production without overstocking. Calculating Net Requirements
The formula for calculating net requirements is:
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
GlossarySubscribe below and receive lean, six sigma, operations, supply chain, logistics, distribution and business terms in your mailbox.
CLICK HERE TO SUBSCRIBE Archives
June 2024
|